Solar Power for Muizenberg Business Park – 100 kW Commercial Solar Installation (Phase 2)

First Energy Solar Installers has completed Phase 2 of the solar roll-out at Muizenberg Business Park in Cape Town’s South Peninsula: a 100 kW grid-tied installation of 225 × 575 W glass-on-glass panels (129 kWp) on a 100 kW three-phase inverter. The system is expected to generate at least 218,903 kWh a year – cutting the park’s carbon emissions by more than 90 tons annually.

The brief: expand a working business-park installation

Business parks have the ideal profile for commercial solar – large, uncluttered roofs and tenants whose consumption runs from early morning to late afternoon on City of Cape Town commercial tariffs. Phase 2 had to add 100 kW alongside the existing installation without interrupting tenants, tie into the park’s metering and SSEG registration, and leave a path for further phases.

The solution: 225 panels on a 100 kW three-phase inverter

  • 225 × 575 W glass-on-glass solar panels (129 kWp)
  • 1 × 100 kW three-phase grid-tied inverter with two MPPT inputs
  • Roof-mounted on aluminium rails with SSEG-compliant DC and AC protection and surge protection
  • Online monitoring of generation and consumption
  • Electrical Certificate of Compliance and City of Cape Town SSEG registration handled by First Energy

The 129 kWp array is over-sized for the 100 kW inverter so the park gets strong generation in winter and the shoulder hours, when the tenants’ load is still high.

The results

  • Estimated annual generation: 218,903 kWh – roughly 18,250 kWh a month
  • Carbon avoided: over 90 tons of CO₂ per year
  • Daytime energy charges for the park reduced in proportion

Commercial savings depend on the tariff, the share of consumption in daylight hours and the demand profile. See how we model payback, NPV and IRR for commercial solar.

Commercial solar installers in Muizenberg and the South Peninsula

Muizenberg is ten minutes from our Kirstenhof head office. We install commercial systems across Muizenberg, Capricorn Park, Tokai, Retreat, Fish Hoek and the South Peninsula – see our Capricorn Business Park 50 kW installation and our commercial solar page.

Frequently asked questions

Can solar be installed in phases on a business park?
Yes. Phased roll-outs let a landlord match investment to tenant demand and cash flow. Each phase is registered with the City and tied into the existing metering and monitoring.

How much does a 100 kW commercial solar system cost in Cape Town?
Indicatively R1.0 million to R1.3 million excluding VAT for a grid-tied system with glass-on-glass panels, before the Section 12B tax allowance. See our commercial solar page for spend brackets.

Does a business park need SSEG registration for solar?
Yes. All grid-connected systems in the City of Cape Town supply area must be registered as small-scale embedded generation. First Energy handles the application and commissioning for each phase.

Commercial solar for your business in Muizenberg and the South Peninsula

Send us 12 months of electricity bills and we will come back with a preliminary design, system size, cost and payback for your premises – request a free commercial solar assessment. Call 087 148 2012 or WhatsApp 084 597 1279. See our commercial solar installations in Cape Town and the Western Cape page for spend brackets, finance options and more case studies.

100 kW commercial solar installation at Muizenberg Business Park, Cape Town – 225 glass-on-glass solar panels on an industrial roof